Buyer: CITY OF ROCKY MOUNT

CITY OF ROCKY MOUNT

General Description

Scope Of Work

Bid is intended as a price and qualifications contract award to remove and replace a portion of the existing 6-inch tipping floor wear topping course at the City of Rocky Mount Solid Waste Regional Transfer Station as detailed on the Appian Consulting Engineers Plan titled, “Point Cloud Slab Elevation Analysis Floor Wear Inspection 2/12/2025”. The concept provided and specified herein assumes, based on research conducted by Appian Consulting Engineers, PA and proven performance of the existing wear course installed in 2014, that the most economical system with proven performance/life span in the range of 10+ years will consist of a 6-inch wear topping course comprised of a proprietary blend of Portland cement, dense aggregate and other additives that will enable the mix to attain the desired strength, density, air content, etc. and provide the desired longevity and wear resistance. Due to the nature of this project, all bidders must meet the rigorous experience qualifications outlined in the specs to be eligible for this project.

The Bid Submittal shall contain evidence of Bidder’s qualifications to do business in the State of North Carolina and evidence of Bidder's qualifications and experience completing this type of work. With their bid submission, bidders must also include documentation of experience qualifications and a project work plan. Specific requirements for these documents are detailed in Section 01004 –SPECIAL CONDITIONS/ SCOPE OF WORK, attached.

Concrete Floor Removal/Replacement: Remove and replace 2,810 SF (13 block sections) of existing 6” reinforced concrete topping slab (depth no greater than 6 inches) in locations shown on the attached “Point Cloud Slab Elevation Analysis Floor Wear Inspection 2/12/2025,” complete in every detail and as specified in this RFP.

Contingency: Remove and replace an additional 15’x15’ block section of 6-inch topping floor slab complete in every detail as specified in this RF, when ordered by Project Engineer. Contractor to bill only for the actual additional field verified quantities installed. Unused funds under this contingency are to be credited to City.

Contingency: Miscellaneous contingency to cover conditions on or below a site that differ materially from what contractor should have reasonably expected, or to cover additions to contract (when ordered by the City or Project Engineer; supported by a City approved estimate). Contractor to bill only for the actual additional field verified quantities installed. Unused funds under this contingency are to be credited to City.

Scope of Work / Product List

No Description Found.

Download Attachments

RFP 320-250425AG - Transfer Station Tipping Floor Repair Project.pdf